The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
EPC Projects
Client
Basrah Mas Co.
Start Date
15/01/2012
Contract
EPC
Duration
14 Months
The company headquarter is plotted over an area of 700 m 2 with over 2,000 m 2 of offices, meeting areas, waiting areas and equipped with dedicated telecommunication system with security integrated system.
The building was the vision of the founder of company the late Mr. Ali. A merging of prefab steel structure and steel prefabricated cement board partitions was used in structuring the building and an elaborate space for future extension, and now it houses all BM operations.

Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Construction of interlock paved 150,000 m2 area for containers stacking.

Construction of interlock paved 55,000 m2 area for containers stacking.