The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
EPC Projects
Client
ICTSI/ BGT
Start Date
05/09/2018
Contract
Unit Price
Duration
12 Months
For phase 2 of the Three Berths contract with International Container Terminal Services Inc. (ICTSI)/Basrah Gateway Terminal (BGT) in Umm Qasr Port, Basrah Mas proceeded with the construction of Berths No. 25 and 26 with a quay structure of 300 m X 42 m and more than 250,000 m2 of stacking yards.

Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Construction of interlock paved 150,000 m2 area for containers stacking.

Construction of interlock paved 55,000 m2 area for containers stacking.