The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
EPC Projects
Client
ICTSI/ BGT
Start Date
23/07/2014
Contract
EPC
Duration
40 Months
Basrah Mas was selected as the sole main contractor to International Container Terminal Services Inc. (ICTSI) to construct three berths at their Basrah Gateway Terminal (BGT) in Umm Qasr Port.
Phase 1 of the project consisted of:
1. Quay structure of 208 m X 30 m 2. Powerhouse 3. Electrical substation 4. 11 Kv transmission line 5. Access road from Umm Qasr south port 6. Administration building 7. Water treatment plant 8. 150,000 m2 interlock paved area for storage 9. Road network and fencing 10. Firehouse 11. Workshops 12. Cathodic protection system

Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Construction of interlock paved 150,000 m2 area for containers stacking.

Construction of interlock paved 55,000 m2 area for containers stacking.