The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
EPC Projects
Client
General Company of Ports of Iraq
Start Date
15/10/2011
Contract
EPC
Duration
17 Months
The General Company for Ports of Iraq (GCPI) required a Control tower in Umm Qasr Port. The total height of the concrete tower is 45m with an observation chamber on top equipped with communication system, telescope system and radar unit.
The project also consists of all services, structures and an office area along with lodging quarters for the officials.

Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Construction of interlock paved 150,000 m2 area for containers stacking.

Construction of interlock paved 55,000 m2 area for containers stacking.