The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
EPC Projects
Client
ICTSI/ BGT
Start Date
11/05/2017
Contract
Unit price
Duration
6 Months
A total of 800,000 cubic meters of materials were dredged in front of berth 27 to reach to navigational depths in accordance with requirement of Umm Qasr port navigational depths. IHC suction cutter dredgers were used with a maximum dredging depth of 16 meters and in/out suction pipe of 600mm

Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Construction of interlock paved 150,000 m2 area for containers stacking.

Construction of interlock paved 55,000 m2 area for containers stacking.