The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
EPC Projects
Client
Prime Metro Power Holdings Corporation (PMPH)
Start Date
20/04/2019
Contract
EPC
Duration
7 Months
Upon request of the client and through several contracts all building composing the powerplant projects were executed which included, powerhouse and engine room, control building, filters structure, main gas feeding line within the premises of the plant, all roads and walkways as well as lighting and landscaping.

Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Construction of interlock paved 150,000 m2 area for containers stacking.

Construction of interlock paved 55,000 m2 area for containers stacking.