Construction works for oil wells in Rumaila oilfields
The work included in this contract covers 119 call offs to construct different oil pads, removal of old ones and implementing all earthwork.
Oil and gas
Client
Prime Metro Power Holdings Corporation (PMPH)
Start Date
27/04/2019
Contract
EPC
Duration
6 Months
Basrah Mas was contracted by Prime power on behalf of GCPI to design and construct a 10" main gas pipeline feeder of 15 km length to feed Umm Qasr gas fired power plant.
Feeding capacity 25 mmscf/day along with all in plant feeding connections. All field inspection is carried out by Oil Pipeline Company (Government company). A major crossing of 150 m.l is foreseen in this project conducted by HDD technique.

The work included in this contract covers 119 call offs to construct different oil pads, removal of old ones and implementing all earthwork.

Basrah Mas Company (BMC) has undertaken a comprehensive overhaul project with the Basra Oil Company (BOC), focusing on 2 X Frame 5 BH Gas Turbines located at Tuba and PS1 stations.

Basrah Mas Company (BMC) collaborated with Basra Energy Company Limited (BECL) to provide extensive Hot Gas Path Inspection services for 5 X Frame 6 GE Gas Turbines at Rumaila Power Plant, emphasizing the importance of energy efficiency and reliability.